Educational

Melmark New England Gymnasium

BWK Construction was selected as the General Contractor for the renovations to an existing gymnasium. The original spline ceiling was removed and the exposed sprinkler heads were raised to be concealed in a new drywall ceiling. The new rubber floor was installed over existing terrazzo and BWK was in charge of designing a basketball court and activity floor that would fit in the space. Wall pads were installed on three of the walls of the gym as well as two adjustable basketball hoops to complete the scaled down basketball court.